An Emergency Repair Keeps Gas Flowing

When a smart pig in-line inspection identified severe corrosion on a 20-inch high-pressure natural gas pipeline, the utility turned to Daryl Smith to coordinate an emergency repair.

How Kerr Engineered Sales and T.D. Williamson helped an east coast utility isolate and replace a severely corroded section of 20-inch high-pressure pipeline in two weeks.

20-inch TDW double STOPPLE® Train in action

When a smart pig in-line inspection identified severe corrosion on a 20-inch high-pressure natural gas pipeline, the utility had to act fast. The amount of corrosion was a serious integrity concern, requiring an emergency repair.

The Solution

The utility turned to Daryl Smith, Sr. Application Specialist from Kerr Engineered Sales. Daryl put an emergency project into motion to replace the corroded section of a carbon steel pipeline in an extremely tight timeline. The project had to be executed in multiple sites without interruption of gas service.

KERR and TDW developed a repair plan using a 20-inch double STOPPLE® Train double block and bleed solution with a full bypass. Daryl rapidly secured the needed double STOPPLE® Train isolation equipment, fittings, and completion plugs. Technical support was fast tracked. After schedules were rearranged, a TDW technician was onsite within days.

With the pipeline in service, crews installed fittings and valves and performed hot taps at multiple locations. The double STOPPLE® Train system was then used to isolate the affected section of pipeline while the temporary bypass maintained gas flow.

Complicated Bend

A bend in the pipeline added a challenge

One section of approximately 30-feet included a bend, complicating the project. This added a challenge to the repair and required careful planning and execution to safely remove and replace the affected section. A temporary bypass maintained gas flow while the damaged pipe and bends were removed and replaced.

The Result

Once the corroded section was replaced at every site, the isolation equipment was removed and the pipeline was safely restored to normal operation. The emergency repair was completed within the two week deadline while gas flowed. A combination of rapid equipment mobilization, technical expertise, and coordinated field execution allowed the utility to address a serious pipeline integrity issue quickly while maintaining service throughout the repair.

Due to highly skilled crews and fast acting support, the elevated risks associated with a severely corroded pipeline were averted.

Preparations for the double STOPPLE® Train double block and bleed

Kerr Engineered Sales Company has represented leading pipeline repair and performance companies in Eastern U.S. since the company was founded in 1952. Today, 74 years later, KERR remains a family business providing gas utilities with equipment, technical expertise, and field support for challenging pipeline operations.


The team of Application Specialists at Kerr Engineered Sales Company is available for technical presentations, product demonstrations, and onsite visits.

Read More
TDW, Pipeline pigging, Corrosion Cindy Kerr TDW, Pipeline pigging, Corrosion Cindy Kerr

V-Jet Pig: Combatting Corrosion

TDW V-Jet® Corrosion Inhibitor Pig was engineered to address the challenge of Top of Line Corrosion. the V-Jet® pig takes a direct and efficient approach of redistributing inhibitor fluid where it’s needed most.

TDW PIGGING INSIGHTS - Episode 7

Top-of-line corrosion (TLC) remains a persistent issue in natural gas pipelines. By its nature, TLC is difficult to control because corrosion inhibitors tend to settle along the bottom of the pipe, leaving the uppermost portion of the pipe wall exposed and vulnerable. Over time, this uneven protection can lead to accelerated internal corrosion, integrity concerns, and increased maintenance costs.

How it Works: The TDW V-Jet® Pig


The TDW V-Jet® Corrosion Inhibitor Pig was engineered to address the challenge of TLC. Instead of relying on traditional methods that struggle to reach the top of the pipe, the V-Jet® pig takes a more direct and efficient approach by redistributing inhibitor fluid where it’s needed most.

  • The V-Jet® design is a series of strategically placed spray nozzles integrated into the scraper body. As the pig travels through the pipeline:

  • Corrosion inhibitor that has pooled at the bottom of the pipe is drawn into the pig through inlet ports

  • The system uses differential pressure to propel the pig forward

  • That same pressure is leveraged to redirect inhibitor fluid through the internal spray system

  • The inhibitor is then projected upward, coating the top of the pipe wall

This process is enhanced by a venturi effect created by the pig’s bypass design. The bypass flow acts as an accelerant, helping atomize and distribute the inhibitor more effectively across the upper internal surface.

Engineered for Simplicity and Reliability

TDW V-Jet® Corrosion Inhibitor Pig

One of the strengths of the V-Jet® pig is its straightforward, field-proven design:

  • No moving parts

  • No onboard pressure vessels

  • No need for pre-charging or complex setup

That simplicity translates to reliability in the field and reduces operational complications during pigging runs.
The ability to consistently deliver corrosion inhibitors to the top of the line is a significant step forward in managing internal corrosion. The V-Jet® pig provides a practical, cost-effective way to improve inhibitor distribution without adding unnecessary complexity to operations.


Bottom Line

With the right tools, TLC can be managed effectively. The TDW V-Jet® Corrosion Inhibitor Pig offers a proven method to enhance protection where traditional approaches fall short. 

To learn more about the TDW V-Jet® Corrosion Inhibitor Pig or to discuss your application, contact the KERR team.


The team of Application Specialists at Kerr Engineered Sales Company is available for presentations, product demonstrations, lunch and learns and customer visits.