EGCR & Industry Events May & June 2022
Join the KERR team at the upcoming 2022 Pipeline Operations & Natural Gas industry events: May 3-5 Eastern Gas Compression Roundtable in Pittsburgh, PA; May 10-12 AUCSC in Morgantown, West Virginia.
Join the KERR team at the upcoming 2022 Pipeline Operations & Natural Gas industry events: Click on each link below to learn more about the events.
May 3-5 Eastern Gas Compression Roundtable in Pittsburgh, PA. EGCR provides the Natural Gas Industry with high quality, cost-effective education via targeted, industry-specific training programs for entry-level through advanced educational needs.
May 10-12 AUCSC Appalachian Underground Corrosion Short Course in Morgantown, West Virginia. The three-day Short Course provides high-quality presentations on the practical and theoretical aspects of the causes and prevention of corrosion on underground structures. Specific topics include instrumentation, corrosion surveys, cathodic protection, pipe coatings and various methods of corrosion control.
June 2-3 Energy Association of PA - Mid Atlantic Gas Transmission & Distribution Seminar & Expo Camp Hill, PA
June 6-10 Northeast Gas Association Smithfield, RI
Kerr Engineered Sales Company has been representing leading pipeline repair and performance companies in Eastern US since the company was founded in 1952. Seventy years later, the company is still a family run business serving customers with the highest quality service and support.
GPT EVOLUTION® Isolation Gasket Redesigned
Improved gasket has a tougher coating and sleek design delivers unprecedented resistance to leakage and flange corrosion with the highest levels of fire safety and isolation.
Maintaining pipeline integrity and keeping emissions in check has never been more important.
The GPT Evolution gasket is improved with a tougher coating and sleek design without a handle. GPT laser etches directly onto this coating; the coating thickness has been doubled to avoid the risk of holidays.
The Evolution® is a fully-encapsulated isolation gasket that delivers the impermeable performance needed to prepare any flange for the increasing risks found in today’s oil and gas industry. The thinner, 1/8” (3mm) design minimizes the difficulties often encountered while attempting to install thicker isolating gaskets. Total encapsulation allows the gasket to be hydro-tested and kept in the pipeline with virtually no loss in isolation properties. No more permeation issues or chemical attacks that plagues GRE gaskets. This innovative gasket is coated using a GPT proprietary material designed specifically for the oil and gas industry that is extremely abrasion and impact resistant.
The new look Evolution gaskets have the revolutionary materials and design providing industry-leading resistance to leakage and flange corrosion, as well as unprecedented levels of fire safety and isolation.
GPT will supply a tag with the size/class/schedule/product style with lot # and part # with each gasket. A “zip tie” is included to connect the tag to the sleeve or flange nut. The external ability to identify the type, size and class of gasket contained within the flange is popular. GPT will continue this benefit with the handle free version of Evolution.
Product Highlights
Passed API 6FB fire testing in multiple sizes and pressure classes and has a considerable increase in operating temperature over GRE products
Revolutionary materials and design provides industry-leading resistance to leakage and flange corrosion, as well as unprecedented levels of fire safety
Rated to 500°F (260°C)*, EVOLUTION® can also operate under high temperatures
EGCR & Industry Events May 2022
2022 events that Kerr Engineered Sales will be attending include the annual Pipeline Pigging & Integrity Management Conference and Exhibition (PPIM) in Houston, TX. January 31- February 4, 2022. Upcoming shows include Ohio Gas Association March 16-18 in Lewis Center OH.
Join the KERR team at the upcoming 2022 Pipeline Operations & Natural Gas industry events: Click on each link below to learn more about the events.
May 3-5 Eastern Gas Compression Roundtable in Pittsburgh, PA. EGCR provides the Natural Gas Industry with high quality, cost-effective education via targeted, industry-specific training programs for entry-level through advanced educational needs.
May 10-12 AUCSC Appalachian Underground Corrosion Short Course in Morgantown, West Virginia. The three-day Short Course provides high-quality presentations on the practical and theoretical aspects of the causes and prevention of corrosion on underground structures. Specific topics include instrumentation, corrosion surveys, cathodic protection, pipe coatings and various methods of corrosion control.
June 2-3 Energy Association of PA - Mid Atlantic Gas Transmission & Distribution Seminar & Expo Camp Hill, PA
June 6-10 Northeast Gas Association Smithfield, RI
Kerr Engineered Sales Company has been representing leading pipeline repair and performance companies in Eastern US since the company was founded in 1952. Seventy years later, the company is still a family run business serving customers with the highest quality service and support.
PHMSA Pipes ACT 2020 - Solutions
PHMSA Pipes ACT 2020 comes into effect Dec 27, 2021. Included within the act are new mandates for PHMSA that require operators to revise all plans to address elimination of hazardous leaks and minimize releases of natural gas. There are proven solutions that the KERR team can help you implement.
The PHMSA Pipes ACT 2020 focus is on eliminating hazardous leaks and emissions reduction and comes into effect on Dec 27, 2021.
What this means for pipeline operators is that they must:
Revise all plans to address elimination of hazardous leaks
Revise all plans to address minimization of releases of natural gas
Revise all plans to address replacement or remediation that are known to leak.
“
PHMSA will require that leak detection and repair programs consider the environment, the use of advance lead detection practices and technologies, and for operators to be able to locate and categorize all leaks that are hazardous to human safety, the environment, or can become hazardous. With regards to pending regulations, the new legislation would require PHMSA to publish Part 2 of the Transmission Rule within 90 days, and within 1 year review comments to the recent advance notice for proposed rulemaking on Class Location Changes. ”
2022 Inspection Cycle
PHMSA has indicated that the 2022 inspection cycle will contain questions related to compliance with the PIPES ACT requirements in Sect 114.
Emissions Reduction Specifics
Gas pipeline operators are required to eliminate hazardous leaks and minimize gas methane releases both planned and fugitive. Operators should evaluate the entirety of their program to ensure the minimization of methane releases.
Solutions for Reducing Emissions
ZEVAC® = Zero Emission Vacuum and Compressor. This revolutionary, patented technology uses compressed air to reduce emissions. Ideal for planned emissions, it is a pneumatic powered vacuum on one side that suctions methane from any pipe/vessel that needs to be de-pressurized. The other side the ZEVAC unit compresses the gas back up to pipeline pressure so it can be discharged to a nearby transmission, distribution pipe.
ZEVAC uses compressed air to draw the pressure down on a section of the pipe and capture natural gas to be re-compressed into an adjacent pipeline.
Bruest Catalytic Heaters are catalytic converters that convert hydrocarbon such as Methane, Propane, and Butane to carbon dioxide and water vapor. Bruest takes advantage of the fact that the conversion process also generates infrared heat to safely heat up natural gas instruments such as valves, regulators, instrument gas and cold temperature sensitive devices.
The catalytic heater panels convert the fuel gas to CO2, water vapor, and infrared heat with virtually no NOx in the process. Bruest also uses Catalytic Heaters to reduce methane emissions in the Fugitive Emission Digester. This unit uses a catalytic heater pad to catalyze methane from instrumentation that would usually bleed to atmosphere.
Bruest HOTCAT heaters upgrade performance with reduced emissions.
GPT Seal ability is key.
The VCS-ID gasket constructed of GRE and a 316SS, has a PTFE inside diameter (ID) it immediately seals the pipe bore preventing media from getting to the GRE. The EVOLUTION gasket eliminates GRE totally, it benefits from the addition of the PTFE ID giving unparalleled sealing tightness performance, ideal for emission reduction in pipeline connections.
The GPT Monolithic Isolation Joints (MIJ) for below ground pipe applications gives a positive, leak proof block against the flow of electrical current in the piping system. MIJs offer an alternative to buried flanges and are maintenance-free and long lasting block against the flow of electric current in all piping systems. MIJs eliminates the risk of failure due to improper field assembly of traditional flange components by providing a complete coated isolation system that simply requires two butt welds on either end of the joint for installation.
PIPES Act 2020 - Leak Specifics
Leak mitigation should be reviewed to ensure leaks are repaired as soon as possible and operators should consider increased leak detection patrols.
For liquid pipeline operators, the primary focus will be on the elimination of hazardous leaks through a comprehensive review of their lines.
Operators need to ensure their repair criteria is sufficient to prevent future leaks e.g. replacement versus sleeve. They need to determine segments of line that need to be remediated or repaired.
KERR Solutions for Leak Detection
Gazomat - Using optical technologies, GAZOMAT detection equipment covers the entire field detection process, including high-speed inspection by car, leak detection on-foot, leak location and quantification, coupled with the newest data processing and GPS mapping tools.
KERR SOLUTIONS FOR LEAK REPAIR AND EMISSION REDUCTION
TDW STOPPLE® isolates a section of line for repairs while maintaining gas supply.
TDW - Hot tapping, STOPPLE®, SHORTSTOPP® and plugging teams use world class technology to create safe work zones for pressurized pipeline maintenance, modification and repair. Strategic use of a STOPPLE® or SHORTSTOPP® plugging device can effectively reduce the overall amount of gas to be blown or drawn down. This is done by isolating a much smaller section of line vs. blowing down a large section between two valves.
TDW in-line inspection (ILI) technologies are fully engineered to provide comprehensive threat assessment and to detect cracks and crack-like anomalies, corrosion and metal loss, dents and interacting threats.
Kerr Engineered Sales Company has represented leading pipeline repair and performance companies in Eastern US since it was founded by Art Kerr, Sr in 1952. They have been serving the industry for over 69 years with knowledge and expertise in natural gas, pipeline, industrial, water and power industries. From gas compressors or pipeline pigs to complex, fully integrated systems, Kerr delivers an exceptional level of expertise and service.